Search
Leave a Message
Thank you for your message. We will be in touch with you shortly.
Explore Our Properties
Cream-colored house with two roof dormers, black shutters, and a curved front walkway amid autumn foliage.

Inwood Park in Inwood, WV: New Plans and a Storied Past

October 8, 2026

"A year from now." Berkeley County Commission President Eddie Gochenour used those words at the Inwood Park groundbreaking on September 4, 2025, when he said he hoped to be cutting a ribbon. That year is up. As of a Panhandle News Network report on September 28, 2026, the park was still under construction, and that report gave no new opening date.

If you drive Winchester Avenue regularly, you've watched the site change. Its official address is 8274 Winchester Avenue. It sits northwest of U.S. 11, across from Musselman High School and next to the W. Randy Smith Recreation Center. Most of the coverage this fall has been about money and amenities. The longer story is that South Berkeley had a place like this before, on roughly the same ground. It lost that place to an apple plant, and the name of that business is now on the high school across the road.

Strong's Grove came first

In August 1889 the Cumberland Valley Railroad opened its extension between Martinsburg and Winchester. That line is now the Winchester & Western. A local history drawn from the Berkeley County Historical Society's A History of Inwood, West Virginia says J.W. Strong set up a gathering ground beside the tracks, known as Strong's Grove. According to that account, the grounds had a clubhouse, a bowling alley, a shooting gallery and a dance pavilion. The railroad brought visitors to events there.

Berkeley County describes the grove as the original "Inwood Park." It hosted picnics, tent revivals, reunions and dances, and it was home to the Inwood Fair. The Journal reported that the site once served as campgrounds for the fair. Thousands of people came by train for circuses, bowling and shooting galleries.

So Inwood had a regional gathering place long before it had a shopping center. People traveled to it, not just through it.

How the grove became an apple plant

Inwood's next chapter began on the same ground. The county says at least part of the original Inwood Park was bought by the C.H. Musselman Co. for an apple processing plant, which opened in 1921. The grove gave way to industry. The Musselman name stayed in the community and is on the high school whose students will soon be crossing U.S. 11 toward the new park.

Putting public land back together took about a hundred years and three separate purchases. The county bought the first of three parcels in August 2021. The Journal reported that the final 8.2-acre parcel was bought last year, bringing the park to about 31 acres.

The county's own wording is careful on this point. Its announcement places the new park "in the vicinity of" the original Inwood Park and stops short of saying the boundaries match. Either way, it's the same rail corridor and the same part of town, and a public gathering ground is coming back to it.

Then and now, side by side

Put the two plans next to each other and they line up closely. The 1890s grove had a dance pavilion, and the county's plan has an amphitheater. The grove had a bowling alley and a shooting gallery, and the new park will have pickleball courts and a disc golf course.

Strong's Grove, late 1800s Inwood Park, as planned
Gatherings Picnics, tent revivals, reunions, dances, the Inwood Fair Amphitheater for community events, multi-use field
Games and sport Bowling alley, shooting gallery Pickleball courts, disc golf, mountain bike area
Getting there Cumberland Valley Railroad Vehicle entrance off U.S. Route 11, pedestrian crosswalk
Outdoors Grove grounds and campgrounds Perimeter walking trail, fishing pond, more trails later

The first phase now under construction includes a multi-use field, a perimeter walking trail, lighted parking, restrooms, pickleball courts, a fishing pond and a disc golf course. A second phase is planned to add a splash park, the amphitheater, a dog park, a mountain bike area, playground equipment, more walking trails and more pickleball courts.

Access is also designed around the main road. Early planning materials showed the vehicle entrance coming directly off U.S. Route 11. There will be a pedestrian crosswalk at the entrance and more crosswalks inside the park where the multi-use path meets the park road. In the 1890s the railroad brought people to the grove. Now U.S. 11 does that job.

Commission Vice President Steve Catlett has compared the planned park to Martinsburg's War Memorial Park, which has served the county since the late 1940s. The comparison fits. South Berkeley has been one of the county's fastest-growing areas, with new schools, shopping centers and housing along the U.S. 11 corridor over the past two decades, and The Journal reports that the park is meant to serve that growing area.

Who is paying for it

The county awarded the $5.7 million Phase 1 contract to Lantz Construction Company of Winchester, Inc., which submitted the low bid. Civil & Environmental Consultants, Inc. is the project engineering firm. The funding for Phase 1 comes from several sources:

Source Amount
Federal Congressionally Directed Spending $1,125,000
West Virginia Governor's Office grant $800,000
West Virginia Division of Highways TAP grant $653,246
Chesapeake Bay Trust grant, for bioretention to manage runoff $144,425
Berkeley County, net bond proceeds About $2.8 million
Berkeley County, grant matching funds More than $400,000

The latest money came in late September 2026. During a weekend visit to the Eastern Panhandle, Gov. Patrick Morrisey announced $1.5 million for Inwood Park from the federal Land and Water Conservation Fund. He said it would pay for a new amphitheater for community events, modern restrooms and new playgrounds.

The same announcement included $140,000 from the same fund for Cold Run Valley Park in Morgan County. That money covers a first phase of work on about 16 acres next to an existing ball complex, starting with a parking area. Inwood's award was more than ten times larger, which gives a sense of the project's size.

The amphitheater, the piece that most directly brings back the grove's role as a place for community events, is the first item named in the new grant. Earlier descriptions listed it in the second phase. Coverage so far doesn't say whether the new money changes the order of construction.

Why there's no ribbon yet

Here's what the public record shows as of September 30, 2026:

  • September 4, 2025: Groundbreaking ceremony, with Gochenour's hope for a ribbon cutting in about a year.
  • May 13, 2026: Most recent update to the county's project announcement.
  • September 28, 2026: Panhandle News Network describes the park as under construction, with no revised opening date.
  • September 29, 2026: The Journal reports the new $1.5 million award and runs a photo of workers building the park entrance.

Estimates for the full cost vary. The Journal's September 2026 story puts the finished park at more than $10 million. Coverage from September 2025 estimated about $13 million for both phases. The $5.7 million figure is only the Phase 1 contract. Most of the features people tend to picture first, including the splash park, the dog park and the playgrounds, are planned for later phases.

The Journal described the park as a project "more than a decade in the making." Measured from 1921, when the apple plant opened on part of the grove's ground, more than a hundred years have passed since this land last served as a public gathering place. For now, the clearest sign of progress is the entrance taking shape on U.S. 11 across from Musselman High School.

The Lopez Team tracks projects like Inwood Park because a new trail, field or amphitheater changes what living in South Berkeley looks like day to day. If you're wondering how the park could affect your street, your rental or your plans along the U.S. 11 corridor, James Jr V Lopez and the team are glad to talk it through. Get in Touch.

Follow Us On Instagram